Book a Check-up

Lendlease Asked for Your Scope 3 Data. Here's How to Respond.

3 min read

A Lendlease project team sends through a sustainability requirement: they need the emissions behind your work, or the materials you supply, as part of their Scope 3 Emissions Protocol. Two questions follow: what counts, and how do you give them something that holds up?

About this guide

CO2 Lab is not affiliated with, endorsed by, or partnered with Lendlease. This guide explains their publicly stated Scope 3 Emissions Protocol, as at October 2026, to help suppliers respond, and is based on the sources linked below. All trademarks are the property of their respective owners.

Why Lendlease is asking

About 90% of Lendlease's emissions are Scope 3, mostly the manufacture of building materials upstream and building energy use downstream. Its Absolute Zero by 2040 target cannot be met from its own operations alone, so the Scope 3 Emissions Protocol sets out which value-chain categories count, and Lendlease is building a data-sharing ecosystem to exchange product-level emissions data across its supply chain. The Supplier Code of Conduct also asks suppliers to minimise their emissions and educate their own supply chains.

What Lendlease asks, by supplier type

If you areWhat they'll want from you
A materials supplier (concrete, steel)Product-level embodied-carbon data, ideally from an EPD
A subcontractor on siteThe emissions of the work you perform, fuel and plant first
Any supplierTo minimise emissions and report under the Supplier Code of Conduct

Embodied carbon is the number they want

In construction the biggest lever is embodied carbon, the emissions locked into materials when they are made, and concrete and steel dominate it. So a materials supplier faces the most specific ask: the emissions per unit of product. A subcontractor is asked for the emissions of the work performed, which is fuel and plant first. Either way it is the same discipline as any customer's data request: a number with the method behind it. Stockland is asking its contractors and suppliers along the same lines.

“Lendlease is moving to structured, product-level data, not a one-line total. A figure you can trace to its method is the one that survives into their protocol.”

What the data-sharing ecosystem means for you

How to respond

A first response to a Lendlease request

  • Build Scope 1 and 2 from your fuel, plant and energy records
  • For materials, work out emissions per unit of product supplied
  • Apply the current NGA Factors and recognised materials data, method shown
  • Flag what is measured and what is estimated
  • Keep the evidence together, so a product-level figure is defensible

Turn the Lendlease request into a traceable number. What our AI Sustainability Analyst gives a subcontractor or supplier:

Reads what you hold
Fuel, plant and energy records already on file, no new data collection to get started.
Calculates your scopes
Scope 1 and 2 against the current NGA Factors, with the method shown alongside each figure.
Shows the working
Source, factor and reasoning behind each number, ready for a product-level data request.
Becomes your baseline
The same pack is your own starting point the day you report in your own right.

Answer the Scope 3 request with something traceable

Our AI Sustainability Analyst builds your footprint from your own fuel, plant and energy records, with the method and evidence behind every figure, ready to share.

Book a Sustainability Check-up

Frequently asked questions

Does Lendlease require subcontractors to report emissions?+

On its projects, increasingly yes. Lendlease's Scope 3 Emissions Protocol and Supplier Code of Conduct ask suppliers and subcontractors for the emissions of their work and materials, with materials suppliers facing the most specific, product-level requests.

What is Lendlease's Scope 3 Emissions Protocol?+

It is Lendlease's stated view of which Scope 3 categories are relevant to its value chain and form part of its Absolute Zero by 2040 target. About 90% of Lendlease's emissions are Scope 3, largely the manufacture of building materials upstream and building energy use downstream, so supplier data is central to hitting the target.

I'm a subcontractor on a Lendlease project. What do I need to provide?+

Expect to be asked for the emissions of the work you do and the materials you supply, increasingly as structured, product-level data rather than a single figure. The Supplier Code of Conduct also asks suppliers to minimise greenhouse gas emissions and educate their own supply chains.

Why the focus on concrete and steel?+

Embodied carbon, the emissions locked into materials when they are made, is the biggest lever in construction, and concrete and steel dominate it. Lendlease is leading on reducing the embodied carbon of concrete, so materials suppliers face the most specific data requests.

What emissions data does Lendlease require from subcontractors?+

Expect to be asked for the emissions of the work you perform or the materials you supply, increasingly as structured, product-level data rather than a single figure. For materials that points to product-level embodied carbon, ideally from an EPD. For site work it is a Scope 1 and 2 footprint led by fuel and plant, with the method shown.

Sources

Primary sources, current at publication. Figures such as emission factors and penalty units are revised periodically. Check the source for the latest.

Keep reading