Transurban Asked for Your Scope 3 Data. Here's How to Respond.

3 min read

A Transurban project team sends through a sustainability requirement: they need the emissions behind your work, or the materials you supply, to feed their construction emissions target. Two questions follow: what counts, and how do you give them something that holds up?

About this guide

CO2 Lab is not affiliated with, endorsed by, or partnered with Transurban. This guide explains their publicly stated emissions targets and supplier engagement, as at October 2026, to help suppliers respond, and is based on the sources linked below. All trademarks are the property of their respective owners.

Why Transurban is asking

Transurban has a science-based target to cut emissions intensity across its major construction and development projects by 55% by 2030. Capital goods, the fuel, materials and plant used to build and widen toll roads, are a major part of its Scope 3, and that is where the target bites. It cannot be met from Transurban's own operations, so the contractors and materials suppliers on those projects are asked for the emissions of their work and products.

What Transurban asks, by supplier type

If you areWhat they'll want from you
A materials supplier (concrete, steel, asphalt)Emissions per unit of product, with the method behind the figure
A civil contractor on a projectThe emissions of the work you perform, fuel and plant first
An operations or maintenance supplierYour Scope 1 and 2, and the emissions of goods you supply

Embodied carbon is the number they want

In civil construction the biggest lever is embodied carbon, the emissions locked into materials when they are made, and concrete, steel and asphalt dominate it. So a materials supplier faces the most specific ask: the emissions per unit of product. A civil contractor is asked for the emissions of the work performed, which is fuel and plant first. Either way it is the same discipline as any customer's data request: a number with the method behind it.

“A 55% intensity target on construction is met one project at a time. A figure you can trace to its method is the one that survives into Transurban's account.”

Why your number matters to Transurban

How to respond

A first response to a Transurban request

  • Build Scope 1 and 2 from your fuel, plant and energy records
  • For materials, work out emissions per unit of product supplied
  • Apply the current NGA Factors and recognised materials data, method shown
  • Flag what is measured and what is estimated
  • Keep the evidence together, so a product-level figure is defensible

Turn the Transurban request into a traceable number. What our AI Sustainability Analyst gives a contractor or supplier:

Reads what you hold
Fuel, plant and energy records already on file, no new data collection to get started.
Calculates your scopes
Scope 1 and 2 against the current NGA Factors, with the method shown alongside each figure.
Shows the working
Source, factor and reasoning behind each number, ready for a product-level data request.
Becomes your baseline
The same pack is your own starting point the day you report in your own right.

Answer the Scope 3 request with something traceable

Our AI Sustainability Analyst builds your footprint from your own fuel, plant and energy records, with the method and evidence behind every figure, ready to share.

Book a Sustainability Check-up

Frequently asked questions

Does Transurban require its suppliers to report emissions?+

Transurban has a science-based target to cut emissions intensity across its major construction and development projects by 55% by 2030. Contractors and materials suppliers on those projects are asked for the emissions of their work and products.

What is Transurban asking its suppliers to do?+

Transurban has a science-based target to reduce emissions intensity across its major construction and development projects by 55% by 2030. Capital goods, the fuel, materials and plant used to build and widen toll roads, are a major part of its Scope 3, so contractors and materials suppliers on those projects are asked for the emissions of their work and products.

I'm a civil contractor on a Transurban project. What do I need to provide?+

Expect to be asked for the emissions of the work you perform and the materials you supply. For construction that is fuel and plant first; for materials like concrete, steel and asphalt it is increasingly product-level data. The starting point is your own Scope 1 and 2, built from records you already keep.

Why the focus on construction rather than the roads themselves?+

The emissions locked into building and widening a road, the embodied carbon in its concrete, steel and asphalt, are a major and controllable part of Transurban's value chain. That is why its most specific target sits on construction and development, and why materials suppliers face the most detailed data request.

Sources

Primary sources, current at publication. Figures such as emission factors and penalty units are revised periodically. Check the source for the latest.

Keep reading