A BHP contract comes with a sustainability expectation attached: BHP wants its suppliers heading toward net zero, and asks for the emissions behind your work. Two questions follow: what is BHP actually committing its suppliers to, and what do you provide?
About this guide
CO2 Lab is not affiliated with, endorsed by, or partnered with BHP. This guide explains their publicly stated Climate Transition Action Plan, as at October 2026, to help suppliers respond, and is based on the sources linked below. All trademarks are the property of their respective owners.
What BHP has committed to
BHP's Climate Transition Action Plan sets a goal of net zero by 2050 for the operational emissions of its direct suppliers, that is those suppliers' Scope 1 and 2, which sit inside BHP's own Scope 3. The commitment is conditional on carbon-neutral goods and services becoming widely available, so it is a direction rather than a hard deadline on you. But the engagement, and the data requests that come with it, are happening now. BHP also targets net zero for emissions from all shipping of its products.
BHP's value-chain goals
| Target | Goal |
|---|---|
| Direct suppliers | Net zero operational (Scope 1 and 2) emissions by 2050 |
| Shipping of products | Net zero by 2050 |
| Overall Scope 3 | Net zero by 2050, as a long-term goal |
| Condition | Subject to carbon-neutral goods and services becoming widely available |
For a services contractor, it's the diesel
Most of what a mining-services contractor emits is diesel, in haul trucks, excavators and gensets. The answer BHP can use is a Scope 1 and 2 footprint allocated to its contract, so the fuel you burn on its sites, which is its Scope 3, is handed over with the method attached. That per-contract allocation is the same discipline behind any customer's data request, applied to a single large client, and the same request BlueScope is making of its own suppliers.
“A conditional 2050 target does not mean wait. The supplier who can already show their footprint, allocated to the contract, is the one BHP keeps as the options to decarbonise arrive.”
Why measuring now is the no-regrets moveHow to respond
A first response to BHP
- Reconcile diesel from bulk-fuel issues and plant hours
- Add grid and genset power for camps and workshops
- Apply the current NGA Factors, on a well-to-wheel basis, method shown
- Allocate the footprint to the BHP contract
- Keep the evidence together, ready for BHP's assurance
Turn the BHP expectation into a number per contract. What our AI Sustainability Analyst gives a contractor:
Give BHP a footprint allocated to its contract
Our AI Sustainability Analyst builds your Scope 1 and 2 from your own fuel and energy records, allocated per contract, with the method and evidence behind every figure.
Book a Sustainability Check-up